
2011-2012. JSC «KEGOC»
On recalculation of installation sag arrows and calculation of wind loads on sections of 500 kV Shu-Almaty 500 and 220 kV Almaty 500 –ATEC3 – PS7 (AKhBK) overhead power lines. 500 kV overhead power lines, new construction. Calculations of sag arrows. Working draft.