Conducting engineering surveys

Service description

 What the service includes:

1. Geodetic surveys

Determination of terrain relief.

Preparation of topographic maps and schemes.

2. Geological surveys

Study of composition and properties of soils.

Assessment of the bearing capacity of the site.

3. Environmental surveys

Analysis of environmental impact.

Preparation of reports for coordination with supervisory authorities of the Republic of Kazakhstan.

4. Hydrometeorological surveys

Study of ground water level.

Assessment of climatic features of the area.

Conducting engineering surveys from our company guarantees a reliable basis for design and minimization of risks during construction.

Company advantages

  • Projects from 220 kV and above

    The experience of our specialists allows us to carry out projects from 0.4 kV to 220 kV and higher.

  • Renewable energy sources

    Design of alternative energy sources.

  • Engineering

    Provision of engineering services for the construction of power grid facilities.

Contact us

OR CALL US BY THE PHONE NUMBER:

Our projects

2019. JSC KEGOC

Construction of communication lines from PS-500 kV "Alma" to Almaty RDC.

Design and estimate documentation.

Working project.

2024 State Institution "Department of Energy and Housing and Communal Services of Almaty Region"

Construction of the 220/110/10 kV Tamasha 2x250 MVA substation in Konayev, Almaty...

2009 JSC "Kazakh Institute of Oil and Gas.

Expansion of the 110 kV switchgear by two cells of the Atyrau 220 substation for connecting the 110 kV Uzlovaya – Atyrau 220 double-circuit overhead power line. Expansion of the 220 kV Atyrau substation...

2024. State Institution "Department of Energy and Housing and Communal Services of Almaty Region"

Modernization of automation and digitalization of water supply and sanitation systems in Konayev, Almaty region. Design and estimate documentation. Working project.

2024. Customer: State Institution "Department of Energy and Housing and Communal Services of Almaty Region"

External power supply scheme for Konayev city, Almaty region. Design and estimate documentation. Working project.

2024. State Institution "Department of Housing and Public Utilities and Housing Infrastructure of the City of Konayev"

Construction of substation PS 110/10 kV "Zhana Ile" 2x40 MVA, with the construction of 110 kV overhead power line in Konayev, Almaty region. Design and estimate documentation. Working project.

2024. State Institution "Department of Housing and Public Utilities and Housing Infrastructure of the City of Konayev"

Reconstruction and construction of 10 kV overhead high-voltage cable lines, in two strings from substation No. 143 "Robot" to the well water intake of the village of Arna, 15 km long, Konayev, Almaty region. Design and estimate documentation. Working project.

2020-2022. JSC "KEGOC"

"Aktyubinsk MES" and "Western MES" Reconstruction of the 220 kV L-540 "Pravoberezhnaya-Inder" overhead power line. Working project

2020-2022. JSC "KEGOC"

"Western MES" Reconstruction of 10 kV current-limiting reactors at the 220 kV Beineu substation. Author's supervision.

2020-2022. KEGOC JSC

Reconstruction of 10 kV current-limiting reactors at the 220 kV Beineu substation. Design and estimate documentation. Working project. Reconstruction of 10 kV current-limiting reactors at the 220 kV Kulsary substation. Design and estimate documentation. Working project.

2020. JSC «KEGOC»

"RECONSTRUCTION OF THE 220KV TRANSMISSION LINE" OF THE BRANCH OF JSC "KEGOC" "AKTYUBINSKIE MES" "RECONSTRUCTION OF THE 220KV TRANSMISSION LINE L-2012 "ORSKAYA-KEMPIRSAY" WITH A LENGTH OF 58.7 KM.

2020. JSC «KEGOC»

"RECONSTRUCTION OF THE 220KV TRANSMISSION LINE OF THE BRANCH OF JSC KEGOC "WESTERN MES" "RECONSTRUCTION OF THE 220KV TRANSMISSION LINE L-2522 "KINEL-URALSKAYA" WITH A LENGTH OF 59.25 KM.

2020. JSC KEGOC

"RECONSTRUCTION OF THE 220KV TRANSMISSION LINE OF THE BRANCH OF JSC KEGOC "AKTYUBINSKIE MES" "RECONSTRUCTION OF THE 220KV TRANSMISSION LINE L-2032 "ORSKAYA-AKTYUBINSKAYA" WITH A LENGTH OF 140.2 KM.

2020. JSC «KEGOC»

"RECONSTRUCTION OF THE 220KV TRANSMISSION LINE OF THE BRANCH OF JSC "KEGOC" "WESTERN MES" "RECONSTRUCTION OF THE 220KV TRANSMISSION LINE L-2582 "STEPNAYA-YUZHNAYA" WITH A LENGTH OF 54.6 KM

2020. JSC «KEGOC»

"RECONSTRUCTION OF THE 220 kV TRANSMISSION LINE OF THE BRANCH OF JSC KEGOC "WESTERN MES" "RECONSTRUCTION OF THE 220 kV TRANSMISSION LINE L-2540 "PRAVOBEREZHNAYA-INDER" WITH A LENGTH OF 196.8 KM.

2019 ZHEL ELECTRIC LLP

Single-circuit 110 kV overhead power line PS 110/35 kV "VES" - PS 220/110/35/10 kV "Zarechnaya" Three single-circuit 35 kV overhead power lines PS 110/35 kV "VES" -35 VEU T1 ÷ T16. Design and estimate documentation. Working project.

2019 ZHEL ELECTRIC LLP

Expansion of the 220 kV outdoor switchgear (2 cells) of the 500/220 kV Aktogay substation, 35 kV overhead power lines and 220 kV overhead power lines as part of the connection of the 50 MW Abay 2 wind farm and the 100 MW Abay 1 wind farm to the 220 kV outdoor switchgear of the 500/220 kV Aktogay substation. Design and estimate documentation. Working project.

2018. Ust-Kamenogorsk Capacitor Plant LLC.

Construction of 110 kV switchgear in East Kazakhstan region. Design and estimate documentation. Working project.

2018 "ECO-SAF LLP"

Construction of 6 kV power transmission line for rotational camp in Atyrau region. Design and estimate documentation. Working project.

2017. JSC KEGOC

Reconstruction of 220 kV switchgear of 500 kV Nura substation. Design and estimate documentation. Working project.


Construction of 110 kV overhead power line in the networks of JSC MREK with a length of 35 km. New construction. Design and estimate documentation. Working project.

2017. Best-groupNS LLP

Modeling of operating modes of a 5 MW wind power plant in the Atyrau region using DigSilentPowerFactory software. Design and estimate documentation. Working project

2015-2016. JSC "Alatau Zharyk Kompaniyasy"

Adjustment of the design and estimate documentation for the construction of a semi-passable channel for transferring part of the loads from the existing PS No. 5 and PS No. 17 to the newly constructed 110/10 kV Otrar PS. Design and estimate documentation. Working draft

2015-2016. JSC "KEGOK"

Construction of the 220 kV overhead line PS 500 kV Semey - ORU Shulbinskaya HPP, Construction of approaches and exits of the 220 kV overhead line PS 51 - PS 18 at the 500 kV Semey substation, Construction of approaches and exits of the 220 kV overhead line PS 18 - Shulbinskaya HPP at the 500 kV Semey substation within the framework of the project "Construction of the 500 kV overhead line Ekibastuz - ShGES - Ust-Kamenogorsk"; Supervision of construction by the project author, carried out in order to ensure compliance of the design solutions contained in the working documentation during construction and installation works. Author's supervision.

2015-2016. JSC "KEGOC"

Expansion of the 220 kV switchgear of the Shulbinskaya hydroelectric power station within the framework of the project "Construction of the 500 kV power line Ekibastuz - ShGES - Ust-Kamenogorsk". New construction. Design and survey work. Working project

2015-2016. JSC "Kazakh Institute of Oil and Gas"

Adjustment of the section "Master plan and transport" of the feasibility study within the framework of the feasibility study project "Construction of a 45 MW wind power plant at the site of the city of Yereymentau. Adjustment". JSC "Kazakh Institute of Oil and Gas". New construction. Adjustment of the feasibility study.

2015-2016. JSC "Alatau Zharyk Kompaniyasy"

Construction of a semi-passable channel for transferring part of the loads from the existing PS No. 5 and PS No. 17 to the newly built 110/10 kV Otrar PS. Reconstruction of 110 kV overhead power lines No. 102A, 105A, 109A, 120AI with replacement with composite wire and the exit of 110 kV overhead power line No. 120 AI to the 220 kV Besagash PS. Adjustment of the design and estimate documentation for the construction of a semi-passable channel for transferring part of the loads from the existing PS No. 5 and PS No. 17 to the newly built 110/10 kV Otrar PS. New construction. Design and estimate documentation. Working project

2013-2014. JSC «KEGOC»

Construction of the 220 kV overhead line "500 kV Semey PS - Shulbinskaya HPP outdoor switchgear" within the framework of the project "Construction of the 500 kV Ekibastuz - ShGES - Ust-Kamenogorsk overhead line". Construction of approaches and exits of the 220 kV overhead line PS No. 51-PS No. 18 at the 500 kV Semey PS within the framework of the project "Construction of the 500 kV Ekibastuz - ShGES - Ust-Kamenogorsk overhead line". Construction of approaches and exits of the 220 kV overhead line PS No. 18 - Shulbinskaya HPP at the 500 kV Semey PS within the framework of the project "Construction of the 500 kV Ekibastuz - ShGES - Ust-Kamenogorsk overhead line". Working draft.

2011-2013. JSC «KEGOC»

Modernization of the NES, stage II. Western MES PS 220/110/10 kV "Tengiz". Design and estimate documentation for the program for the reliability of the functioning of the Unified Energy System of Kazakhstan for 2008-2016. Reconstruction. Working project.

2011-2013. JSC «KEGOC»

Modernization of the NES, stage II. Western MES PS. 220/110/10 kV "Inder". Design and estimate documentation for the program for the reliability of the functioning of the Unified Energy System of Kazakhstan for 2008-2016. Reconstruction. Working project.

2011-2013. JSC «KEGOC»

Modernization of the NES, stage II. Western MES PS 220/110/10 kV "Beineu". Design and estimate documentation for the program for the reliability of the functioning of the Unified Energy System of Kazakhstan for 2008-2016. Reconstruction. Working project.

2011-2012. JSC «KEGOC»

Modernization of the NES, stage II. Western MES "PS 220/110/10 kV "Atyrau". Design and estimate documentation for the program of reliability of the functioning of the Unified Energy System of Kazakhstan for 2008-2016. Reconstruction. Working project.

2011-2012. JSC «KEGOC»

On recalculation of installation sag arrows and calculation of wind loads on sections of 500 kV Shu-Almaty 500 and 220 kV Almaty 500 –ATEC3 – PS7 (AKhBK) overhead power lines. 500 kV overhead power lines, new construction. Calculations of sag arrows. Working draft.

2011-2012. JSC «KEGOC»

Modernization of NES Stage II. Western MES "PS 220/110/10 kV" Atyrau "; Customer: JSC" KEGOC " Design and estimate documentation for the program of reliability of the functioning of the Unified Energy System of Kazakhstan for 2008-2016. Reconstruction. Working project

2010. TOO "PTI pishchepromproekt"

Installation of 10/110 kV step-up transformers and 110 kV outdoor switchgear of a 90 MW gas turbine power plant in Atyrau. New construction. 110 kV outdoor switchgear of a gas turbine power plant. Working documentation.

2008-2009. Promstroy-Energo LLP

"Power supply of a residential building located at the address south of the Esentai River, west of Zhamakaev Street. External networks. Working project.

2008-2009. KerneuLimited LLP

"Modernization of relay protection and automation equipment for substations and measurements of the 220 kV "EPK" substation. The working design of the 220 kV EPK substation was developed based on the KEGOC National Electric Grid Modernization Program. Cable facilities, grounding and auxiliary equipment for relay protection and automation equipment and measurements.

2008-2009. JSC "Kazakh Institute of Oil and Gas.

"Expansion of the 110 kV switchgear for two cells of the Atyrau 220 substation for connecting the 110 kV double-circuit overhead power line "Uzlovaya - Atyrau 220" Expansion of the 220 kV Atyrau substation, design of the 220/10 kV A-NPS3A and A-NPS-4 substations Section: Secondary connections and relay protection and automation of 110 kV overhead power line cells. Substation control and automation. Project. Working documentation